Changes
##GE Water & Process Technologies
##http://en.wikipedia.org/wiki/GE_Wind_Energy GE Wind Energy]
__TOC__
=='''Orders Backlog'''==
GE's total backlog of firm unfilled orders at the end of 2010 was $66.7 billion, a decrease of 1% from year-end 2009, reflecting decreased demand at Energy Infrastructure, partially offset by increased demand at Technology Infrastructure. Of this backlog, $46.0 billion related to products, of which 59% was scheduled for delivery in 2011. Product services orders, included in this reported backlog for only the succeeding 12 months, were $20.6 billion at the end of 2010. Product services orders beyond the succeeding 12 months were approximately $108.7 billion, which combined with the firm unfilled orders described above resulted in a total backlog of approximately $175.4 billion at December 31, 2010.
=='''SWOT Analysis'''==
GE Energy is a leading supplier of technology, products and services to the global energy industry. The company is a part of GE Infrastructure, an operating segment of General Electric (GE). GE Energy's strong market position gives it significant bargaining power. However, the company could be threatened by rising steel prices which could impact its profitability.
{|border="2" cellspacing="0" cellpadding="4" width="100%"
|Strengths
|Weaknesses
|-
|Strong market position<br>Support of parent company<br>Technology and innovation
|Weak operating performance
|-
|Opportunities
|Threats
|-
|Commitment to new technologies<br>Growth in aerospace industry<br>Increase in demand for natural gas
|Rising steel prices<br>Interest rates<br>Environmental regulations
|-
|}
=='''Latest News'''==
#Lake Erie Becomes Site for GE's First Ever Freshwater Wind Farm in the U.S. BY Addy DugdaleMon May 24, 2010 [http://www.fastcompany.com/1651481/ge-lake-erie-leedco-freshwater-wind-farm http://www.fastcompany.com/1651481/ge-lake-erie-leedco-freshwater-wind-farm]
#GE Wind Service IT Platform Selected for InfoWorld's Annual Green 15 Award Posted May 5th, 2011. [http://www.pressreleasepoint.com/ge-wind-service-it-platform-selected-infoworld%E2%80%99s-annual-green-15-award http://www.pressreleasepoint.com/ge-wind-service-it-platform-selected-infoworld%E2%80%99s-annual-green-15-award] ..
#Reaching Toward the Sky: GE Energy Introduces Taller Wind Turbine Towers. April 04, 2011 [http://www.windturbines.net/news/Reaching-Toward-the-Sky-GE-Energy-Introduces-Taller-Wind-Turbine-Towers-aqj http://www.windturbines.net/news/Reaching-Toward-the-Sky-GE-Energy-Introduces-Taller-Wind-Turbine-Towers-aqj]
=='''Addresses of GE Energy in Other Countries'''==
{|border="2" cellspacing="0" cellpadding="4" width="100%"
|'''GE Wind Energy GmbH'''<br>Holsterfeld 16, 48499 Salzbergen, Germany<br>'''Phone:''' +49 (0)5971 980-0<br>'''Fax:''' +49 (0)5971 980-1999
|'''GE Energy France'''<br>1321, Chemin des Cailloux<br>69390 Charly, France<br>'''Phone:''' +33 (0)72 317-737<br>'''Fax:''' +33 (0)72 317-654
|-
|'''GE Energy China'''<br>18/F Kerry Center, No. 1 Guang Hua Road<br>100020 Chaoyan District - Beijing, China<br>'''Phone:''' +86 (0)10 5822-3700<br>'''Fax:''' +86 (0)10 6561-1566
|'''GE Energy Italy'''<br>c/o Nuovo Tignone, Via Felilce Matteucci, 2<br>50127 Florence, Italy<br>'''Phone:''' +39 (0)55 4263 4541<br>'''Fax:''' +39 (0)55 4263 2800
|-
|'''GE Energy Spain'''<br>Juan Bravo 3C, 8° Planta<br>28006 Madrid, Spain<br>'''Phone:''' +34 (0)91 587 0500<br>'''Fax:''' +34 (0)91 587 0665
|'''GE Energy UK'''<br>The Arena, Downshire Way<br>RG12 1 PU Bracknell - Berkshire, Great Britain<br>'''Phone:''' +44 (0)1344 460-500<br>'''Fax:''' +44 (0)1344 460-567
|-
|'''GE Energy Canada'''<br>555 Boul. Frederick Phillips, 3rd. Floor<br>H4M 2X4 Montréal, Québec, Canada<br>'''Phone:''' +1 (0)905 858-5110<br>'''Fax:''' +1 (0)905 858-5390
|
|-
|}