Changes

Jump to: navigation, search

Ureteral Stent

144 bytes added, 05:07, 4 August 2008
/* Review components */
| Calibration records and preventive maintenance records; in-process / incoming inspection test methods and related test method validations
|
# Check the entire equipment-related lifecycle
# Was machine operational qualification performed?
# Was the measurement equipment validated?
|
|-
| DV&V reports, Shelf-life reports, Biocompatibility test reports, Sterilization reports, Packaging Validation reports, Process Validation Reports
|
#
|
|-