Changes
/* Review components */
# Check whether appropriate verifications and validations are performed
# Establish if all specifications are linked to design inputs
| rowspan="3"| Quality systems, CAD
|-
| Appropriate design verification and validations (DV&V) are performed
|
# Show DV&V criteria are based on risk management requirements
|-
| Product performance specifications correspond to appropriate design output documents
# Correlate design drawings with the specifications
# Check whether maximum dimensions, sizes etc. (with tolerances) are within the specified range
|-
!rowspan="4"|Risk Management Documents
# Does it adhere to appropriate ISO 14971 standards?
# Does it adhere to appropriate client standards?
|rowspan="4"| Quality systems
|-
| DFMEA links appropriately to the PPS
|
# Verify
|-
| Appropriate DV&V reports and design output documents are reference correctly as risk mitigation activities in the DFMEA
# Validate the process and correlate with design inputs
# Validate the ranges used are within range of risk mitigation criteria
|-
| PFMEA links appropriately to the process validation protocol acceptance criteria; In-process inspection procedures and/or manufacturing procedures are recorded as appropriate risk mitigation activities in the PFMEA
|
|-
!rowspan="2"|Design Output Documents
# Check if the CAD diagrams overlay and "fit" perfectly
# Check tolerance stackups
|rowspan="2"| Quality systems, CAD
|-
| Correlate First Article Inspection data to the dimensions on the drawings